{"id":19,"date":"2021-04-07T14:28:30","date_gmt":"2021-04-07T14:28:30","guid":{"rendered":"https:\/\/www.clicknorthroad.co.uk\/?page_id=19"},"modified":"2023-12-22T11:18:48","modified_gmt":"2023-12-22T11:18:48","slug":"home","status":"publish","type":"page","link":"https:\/\/miraconsultation.co.uk\/","title":{"rendered":"Home"},"content":{"rendered":"\n
Your web browser is out of date and is incompatible with the interactive features of this website. Please update or change to a different browser to continue.<\/p>\n <\/div>\n<\/div>\n<\/div>\n\n\n\n
Welcome to the consultation website for proposals at MIRA South Site, Nuneaton.<\/p>\n\n\n\n
Horiba MIRA is the owner\u2019 of MIRA Technology Park and has recently entered into a development partnership with Evans Randall Investors to develop future phases of the new Technology Park.<\/p>\n\n\n\n
Proposals for MIRA South Site will provide new high-quality employment space, together with accesses, a new link road, landscaping, sustainable drainage and other associated infrastructure.<\/p>\n\n\n\n
Planning Application Update \u2013 December 2023<\/strong><\/strong><\/strong><\/p>\n\n\n\n Further to the changes in relation to transport and highways design the project team continued to engage with North Warwickshire Borough Council (NWBC) and National Highways to ensure the proposed road network appropriately serves the new development and existing routes. With that in mind a further Transport Assessment Addendum (II) has been submitted to NWBC. You can download the TAA (II) here: Part 1<\/strong><\/a> ; Part 2<\/strong><\/a>: Part 3<\/strong><\/a>.<\/p>\n\n\n\n The changes to the previous TA Addendum are specifically:<\/p>\n\n\n\n Removal of \u201cLeft in Left Out\u201d junctions at A5\/Woodford Lane and A5\/Drayton Lane<\/strong> Upgrade works to Higham Roundabout on the A5<\/strong> All other proposals remain the same as submitted in October 2023.<\/p>\n\n\n\n View the additional information that has been submitted and send any comments you may have directly to the following councils.<\/strong><\/p>\n\n\n\n (Select the appropriate authority based on your residency).<\/em><\/p>\n\n\n\n<\/div>\n\n\n\n Planning update \u2013 October 2023<\/strong><\/strong><\/p>\n\n\n\n Following submission of the planning application in August 2022, North Warwickshire Borough Council undertook public consultation to obtain comments from the local community and statutory consultees on the submitted plans and documents. In response to the comments made, the project team carried out further technical work. The additional work was completed and changes in relation to transport and highways design, set out in a Transport Addendum<\/strong><\/a>, and the parameter plan<\/strong><\/a> were submitted to the council.<\/p>\n\n\n\n The changes that have been made to the application are set out below.<\/p>\n\n\n\n A5 junctions at Woodford Lane and Drayton Lane \u201cleft in left out\u201d<\/strong> Weddington Lane to be downgraded and stopped off at Caldecote<\/strong> New safeguarded area to the northeast of the village hall of Caldecote<\/strong><\/strong> Diversion of footpath AE189<\/strong> Previous Planning Updates<\/strong><\/strong><\/strong><\/p>\n\n\n\n In response to statutory comments in relation to flood risk and heritage impact, further technical work was undertaken, and supplementary information submitted.<\/p>\n\n\n\n A specialist project team has been appointed to develop the proposals for MIRA South Site. <\/strong><\/p>\n\n\n\n Click the logos below to find out more about the team.<\/p>\n\n\n\n MIRA South Site is located on the outskirts of Nuneaton, to the south of the wider MIRA Technology Park. It is bounded by the A5 (Watling Street) to the north and the A444 (Weddington Lane) to the south. The site is approximately 500m north-east of the village of Caldecote. The Site lies within the administrative area of North Warwickshire, but borders Hinckley and Bosworth to the north and Nuneaton and Bedworth to the east.<\/p>\n\n\n\n The site is well connected by road services. There is direct access to the A5, which provides onwards connections to Atherstone, Nuneaton and Hinckley. The Weddington Walk cycleway and footpath run along the eastern edge of the site and the MIRA bus stop is accessible just north of the site.<\/p>\n\n\n\n The proposals present a unique and exciting opportunity to develop new high-quality employment land and bring forward highly skilled jobs for local people. The vision is to provide a high-quality business park based on good sustainable principles creating new employment opportunities that will last for generations to come.<\/p>\n\n\n\n The proposals will incorporate a range of building sizes, suitable for manufacturing and research companies, with associated office space and storage, depending on tenant requirements. The range of employment unit sizes will be carefully judged to complement existing and proposed future land uses in the area and to meet the needs and requirements of businesses in the growing hi-tech manufacturing industry.<\/p>\n\n\n\n We are preparing an outline application (with all matters reserved other than access) for MIRA South Site to provide a strategic employment development park, together with accesses, new link road, landscaping, sustainable drainage and other associated infrastructure. The finer details of the proposals including layout, building size, appearance and landscaping will be form part of a future reserved matters application for the site.<\/p>\n\n\n\n The project team has listened to feedback from stakeholders and local residents, and where possible has made changes to the masterplan to address concerns raised. Our key changes and design ideas for the revised proposals include:<\/p>\n\n\n\n Revised site layout<\/p>\n\n\n\n Enhanced landscaping<\/p>\n\n\n\n Repositioning of footpaths and walkways<\/p>\n\n\n\n Improvements to Redgate Junction<\/p>\n\n\n\n Alteration to unit sizes<\/p>\n\n\n\n Country Park expansion<\/p>\n\n\n\n Re-design of the A444<\/p>\n\n\n\n The changes can be seen on the revised indicative masterplan below, click to enlarge the image and scroll to compare with the previous plan.<\/p>\n\n\n\n The current vision for the site will provide:<\/p>\n\n\n\n Details relating to transport have been prepared by our Transport Consultants, Milestone and will be approved as part of the outline planning permission.<\/p>\n\n\n\n The primary access to the development is based around the construction of a fourth arm to the southern side of the existing MIRA Roundabout on the A5 Watling Street.<\/p>\n\n\n\n At the MIRA roundabout on the A5 Watling Street a field access track is presently connected into the roundabout. The geometric design of the existing MIRA roundabout is such that it can be easily adapted to create a full access road that can accommodate the anticipated volumes of light vehicles and HGVs.<\/p>\n\n\n\n A new 3-arm roundabout will be constructed on the A444 Weddington Lane to the south-east of Caldecote Lane, providing a second primary access to the site. A roundabout in this location will also function as a traffic management feature for vehicles through Caldecote.<\/p>\n\n\n\n The scheme will include signage\/traffic orders such that all HGVs over 7.5T between the A5 corridor and Nuneaton will be redirected onto the link road\/MIRA roundabout, effectively removing all HGV traffic from Weddington Lane through Caldecote village.<\/p>\n\n\n\n The two external accesses will be connected by a new, adoptable link road.<\/p>\n\n\n\n The link road will have grass verges, footpath and cycleways and extensive tree and shrub planting to create a green ribbon running north to south through the development.<\/p>\n\n\n\n New footpaths will be provided along the link road to provide pedestrian access, the paths will be separated from the carriageway by grass verges. These will provide paved, well lit, routes between the A5 and A444. Routes to buildings have been designed, where possible, to provide segregation between pedestrians and vehicles.<\/p>\n\n\n\n In addition to a new cycleway running along the southern side of the link road, new cycle routes will be provided linking the development with the existing cycle route along Weddington Walk and an additional route, within the site, will run along the A444 enabling the potential for a future extension to Nuneaton.<\/p>\n\n\n\n Significant investment will be made into the highway network to redevelop the Redgate Junction, which will be upgraded to provide a 4-arm roundabout. This improvement measure will deliver significant additional capacity on all approaches that will reduce existing issues of queuing and delays, particularly during weekday peak periods.<\/p>\n\n\n\n The new buildings will be supported by landscaping, careful location of trees, shrub and ground cover planting will distinguish routes and spaces, provide landmarks and focal points, and define views and vistas. The species list for the structural planting will be confirmed once the design for the site has been developed further. This may be subject to change depending on the recommendations forthcoming from any formal biodiversity assessments of the site proposals.<\/p>\n\n\n\n The proposals also include social infrastructure to provide spaces for the community, for relaxation and for health and fitness, it is these spaces that forge a sense of community and place within the development. The social infrastructure is made up of three key elements including health and fitness, mindfulness and community.<\/p>\n\n\n\n Seven new high-quality flexible employment units<\/p>\n\n\n\n 2,500 highly skilled jobs to support local people<\/p>\n\n\n\n Opportunities for apprenticeships<\/p>\n\n\n\n Enhanced landscaping creating a high-quality visual appearance and supporting biodiversity<\/p>\n\n\n\n Circular routes for recreation, fitness and dog walking, an outdoor gym and seating areas<\/p>\n\n\n\n New and enhanced bus routes with bus stops at the northern and southern ends of the site<\/p>\n\n\n\n New cycle routes including a connection to Weddington Walk<\/p>\n\n\n\n Construction jobs<\/p>\n\n\n\n On-site car parking, including electric charging spaces<\/p>\n\n\n\n Investment into local services and infrastructure<\/p>\n\n\n\n A sustainable scheme targeting a BREEAM \u2018Excellent\u2019 rating and EPC \u2018A\u2019 rating.<\/p>\n\n\n\n<\/div><\/div>\n\n\n\n Barton Willmore is working with MIRA to prepare proposals for new employment space.<\/strong><\/p>\n\n\n\n July 2022 \u2013 The consultation period for comments on MIRA South Site has now closed.<\/strong><\/p>\n\n\n\n Thank you if you have submitted feedback to us on the revised proposals. All the comments we received are being carefully considered by the project team. If you have signed up to our mailing list, we will provide further updates shortly.<\/p>\n\n\n\n Our revised proposals were presented at a live online public webinar on Thursday 21 July 2022. A recording of the webinar can be found below.<\/p>\n\n\n\n<\/div>\n\n\n\n
This is no longer proposed and instead a financial contribution will be provided via a Section 106 Agreement to a safety enhancement scheme now to be advanced by National Highways themselves. Further detail is provided in Section 6 of the TAA(II).<\/p>\n\n\n\n
No works were previously proposed to this roundabout, but following discussions with National Highways, enhancements to capacity are now proposed. Further detail is provided in Section 3 of the TAA (II). For ease the proposed junction improvement design can be found here<\/strong><\/a>.<\/p>\n\n\n\n\n
The junction design was updated<\/strong><\/a> to make the A5 junctions at Woodford Lane and Drayton Lane \u201cleft in left out\u201d (LILO) junctions only. The proposed LILO junctions at Woodford Lane and Drayton Lane were intended to be safer and prevent \u201crat running\u201d through Fenny Drayton village.<\/p>\n\n\n\n
The highway design was updated<\/strong><\/a> and it was proposed for the northern section of Weddington Lane to be downgraded and stopped off at Caldecote. The proposed closure of the northern section of Weddington Lane was intended to prevent vehicular traffic using the old A444 route past Caldecote and force traffic to use the rerouting of the A444 through the MIRA South Site onto the A5 (and vice versa), which was thought to improve the amenity of Caldecote village. <\/p>\n\n\n\n
The parameter plan was updated to include a proposed new safeguarded area to the northeast of the village hall of Caldecote. The safeguarded area ensures that no building over 10m can be developed within 150m of the village hall. This change will further protect the setting of the Caldecote Conservation Area and the amenity of the residential properties adjacent to the village hall.<\/p>\n\n\n\n
The parameter plan was updated to reflect a diversion of footpath AE189 to solely within the MIRA South Site boundary and enable the route to be classed as a Public Right of Way. This update replaces former proposals to divert footpath AE189 via Weddington Walk, which does not benefit from Public Right of Way status. This change was made to address concerns from the Ramblers Association and WCC Rights of Way Team.<\/p>\n\n\n\n<\/div>\n\n\n\n\n
Meet the team<\/h2>\n\n\n\n
<\/a><\/figure>\n\n\n\n
<\/a><\/figure>\n<\/div>\n\n\n\n
<\/a><\/figure>\n\n\n\n
<\/a><\/figure>\n<\/div>\n\n\n\n
<\/a><\/figure>\n\n\n\n
<\/a><\/figure>\n<\/div>\n<\/div>\n\n\n\n<\/div><\/div>\n\n\n\n
Site Location<\/h2>\n\n\n\n
Proposals<\/h2>\n\n\n\n
Revised Indicative Masterplan<\/h3>\n\n\n\n
<\/a>
Previous Indicative Masterplan<\/h3>\n\n\n\n
<\/a>
Vision<\/h3>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n<\/figure>\n\n\n\n
Transport and Access<\/h3>\n\n\n\n
A5 MIRA Roundabout<\/h4>\n\n\n\n
A444 Weddington Lane<\/h4>\n\n\n\n
A5-A444 Spine Road Link <\/h4>\n\n\n\n
Redgate Junction <\/h4>\n\n\n\n
Landscaping<\/h3>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n\n\n\n
<\/figure>\n
Local Benefits<\/h3>\n\n\n\n
Consultation<\/h2>\n\n\n\n